Télécharger Imprimer la page

GE Zoneline AZE Serie Manuel Du Propriétaire page 22

Publicité

REQUIREMENTS FOR OPERATION
Requirements for Operation, Service and Installation of Appliances Using
Flammable Refrigerants
Decommissioning
being carried out, an oil and refrigerant sample shall be taken in case analysis is required prior to re-use of
• recovery equipment and cylinders conform to the appropriate standards.
system.
the equipment are removed from site promptly and all isolation valves on the equipment are closed off.
cleaned and checked.
Labeling
be dated and signed. For appliances containing FLAMMABLE REFRIGERANTS, ensure that there are labels
on the equipment stating the equipment contains FLAMMABLE REFRIGERANT.
22
REFRIGERATING SYSTEM unless it has been
49-5001038 Rev. 1

Publicité

loading

Ce manuel est également adapté pour:

Zoneline azh serieZoneline azv serie