Install the mount onto a strong structure.
Prepare the Junction box base and the accessaries for installation.
1. Locate the mounting template at the installation position and drill the ceiling or
wall if needed.
2. Route the Power/Ethernet cables through the grommets from the wall. Insert the
grommets onto the Junction box base.
3.
mounting screws (4x30mm).
EN
9