Eneo VTL-WWA Instructions De Montage page 10

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 12
ATTENTION
Ensure that the mains is switched off before attempting to work with the housing.
.
Route the cables inside the bracket (X); feventually removing one of the side parts (Y) (Fig. ).
.
Fasten in the requested position the bracket (X) using diameter 8mm screws with suitable rawlbolts (Fig. ).
.
Place the joint perpendiculatly to the housing (Fig. ).
4.
Loosen the screw (A) and unscrew the two screws (B) with 4mm allen key.
For easier access to the screws (B) push the sunshield forward (Fig. ).
5.
Slide the body of the housing. Disconnect the earth connection. The body hangs and can be taken out.
6.
Route the cables inside the joint and assembly it to the bracket with screw (C) and nut (D) (Fig. ).
7.
Break the diaphragma of the rubber glands (E) to be used (two for diameter 7~9mm and two for diameter
9~mm cables (Fig. 4).
8.
Route the cables inside the rubber glands (E) and screw the two screws placed in the middle of the two plates
(F) (Fig. ).
9.
Make the electrical connections. See on the back.
0. Fasten the camera (eventually with spacers) to the internal slide with screw (G) and relevant insulating washer
(Fig. ).
. Place the housing in the requested direction and fasten the joint screwing the screws (C) and (H) with 6mm
allen key (Fig. 4).
. Close the housing proceeding in the opposite direction of the opening. Replace the body, make the earthing,
fasten the body to the back part, lock the screw (A) of the external slide.
0

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Vtl-wwdVtl-dpw

Table des Matières