7.8 Built-in switch box
DANGER
Risk of electric shocks
The connections between switch box
and hob must be made before the mains
connection!
The appliance must be cut off from the
electricity supply before the plug retainer is
opened again.
The appliance may only be connected to
the mains once the plug connection has
been made.
2
Please observe the following order:
1 Make plug connection
2 Connect the appliance to the power supply system
•
The switch box is pre-assembled in the factory. It is
designed for installation in material thicknesses of
from 13 mm to 36 mm.
•
Set the switch box in accordance with the material
thickness of the cupboard cover with the stud bolts
and nuts.
•
Please have your drilled holes in the cupboard cover
made by a qualifi ed electrician in accordance with the
dimensional drawing.
Instructions for assembly
1
ENG
41