3. Make sure the LOW IDLE switch is in OFF
position on both generators.
4. The parallel operation outlets allow you to connect
two AIPOWER generators to increase the total
available electrical power. The AIPOWER Parallel
Operation Kit can be purchased. Follow the
instructions included with your parallel operation kit
for proper installation and operation.
5. Start one of the generators and wait until
the engine speed to stabilize.
6. Start the second generator and wait until
the engine speed to stabilize before connecting a
load.
7.Plug in the 240 Volt AC, single phase, 60Hz
electrical loads into parallel kit receptacles and turn
on first load. Allow generator output to stabilize
before plugging in the next load.
NOTE:
It is strongly recommended to plug in devices
with the largest output first and the smallest output
last to help prevent overloading the inverters. Do not
exceed maximum wattage rating of inverters, parallel
kit and receptacles.
Page 26