INSTALLATION
Montage
Building in the extractor hood
• Remove the edge-extractor panel:
- Flip the edge-extractor panel downwards.
- Release the latch cables by turning the bayonet catch 180
degrees.
- Disconnect the connectors from the electricity cable.
Remove the edge-extractor panel from the extractor hood.
• Put the plug of the extractor hood in the socket.
• Connect the 7-pole connector to the 7-pole connector of the
external motor (WU11..PX/WU15..PX).
• Position the extractor hood in the hole and slide the 4 sliding pieces
outwards from inside the hood. The extractor hood should remain
hanging.
• Secure the extractor hood to the joists or to the ceiling using the
screws provided and the holes intended for this purpose.
• Refit the edge-extractor panel.
Do not forget to reconnect the electric cable connectors and to
pull the cables taut so they do not get caught in the hinge.
EN 17