˜ Assembling the
product
1. Secure the bottom pole
using a suitable base
weighs min. 25 kg, with a base
tube height of 40cm or higher
(Fig. E).
If anchoring the product
o
directly in the ground (e.g.,
sand), insert the bottom pole
at least 30 cm or more into the
ground at a slight angle (Fig.
E).
2. Ensure the locking lever
pulled all the way up (Fig. B).
3. Insert the upper pole
8.5cm deep into the bottom
pole
(Fig. B).
8 ]
[
4. Push the locking lever
the way down until it touches
the bottom pole
˜ Opening the product
1. Locate the slider
canopy
(Fig. A).
1 ]
[
2. Push the slider upwards
until the spokes
extended (Fig. C) and the
catch spring
clicks into place (Fig. A).
8 GB/IE/NI
[
8 ]
that
10 ]
[
is
[
7 ]
about
6 ]
[
all
7 ]
[
(Fig. B).
[
8 ]
under the
[
4 ]
are fully
[
2 ]
noticeably
[
3 ]
˜ Adjusting the height
m CAUTION! RISK OF
INJURY!
Keep your fingers away from
the joint between the upper
and the bottom pole to avoid
pinching your fingers.
1. Locate the locking lever
the bottom pole
2. With one hand, firmly grip the
upper pole
6 ]
[
other, pull the locking lever all
the way up (Fig. B).
3. Slowly lift or lower the upper
pole to the desired height.
4. Push the locking lever all the
way down so it touches the
bottom pole to fix the upper
pole in position(Fig. B).
˜ Tilting the canopy
m CAUTION! RISK OF
INJURY!
Keep your fingers away from
the tilt joint to avoid pinching or
injuring them.
1. Locate the tilt joint cover
the upper pole
the cover up to uncover the tilt
joint
(Fig. D).
5 ]
[
on
[
7 ]
(Fig. A).
8 ]
[
and with the
on
5 ]
[
and push
6 ]
[