Installation
1
Wall Setup
Préparation du mur
Determine the valve location in the wall. For an op-
timal installation, position the valve on a plywood
backing attached the adjacent 2x4 studs.
BEFORE FIXING THE VALVE ONTO THE PLYWOOD BACKING,
MAKE SURE IT IS LEVEL.
TO ENSURE PROPER INSTALLATION OF THE VALVE INSIDE
THE WALL, IT IS VERY IMPORTANT TO FOLLOW THE RECOM-
MENDED DEPTH AS INDICATED IN THE ILLUSTRATION (Pag.
3-4).
Déterminer la position de la valve dans le mur. Pour
une installation optimale, fixer la valve sur un support
arrière en contre-plaqué assemblés aux montants
2x4.
AVANT DE FIXER LA VALVE AU SUPPORT EN CON-
TRE-PLAQUÉ, S'ASSURER QU'ELLE SOIT À NIVEAU.
AFIN D'OBTENIR UNE INSTALLATION CORRECTE DE LA
VALVE, IL EST IMPORTANT DE RESPECTER LA PROFONDEUR
SUGGÉRÉE TEL QU'ILLUSTRÉ (Pag. 3-4).
Last revision:14/02/2018
5
Totem
Fig.1
aquabrass.com