6 6 6 6
INSTALLATION
INSTALLATION
INSTALLATION
INSTALLATION
6.1
Shipping and setting-up the KUDO
6.1.1
Shipping the KUDO
The optional L-ACOUSTICS
captive dolly board's ball locking pins in the enclosure's front locator studs, thus allowing easy transportation and
protection of the enclosure.
!
It is recommended to use the L-ACOUSTICS
KPLA-2.
IMPORTANT
®
6.1.2
K-LOUVER
coverage pattern adjustment
®
KUDO
incorporates K-LOUVER
different directivity settings: 50° or 110° symmetric patterns or 80° left or right asymmetric patterns, as shown in the
following figure:
25° / 25° (50° symmetric)
55° / 25° (80 ° asymmetric - left)
KUDO_UM_ML_2-0
®
®
®
KPLA-2 dolly board (see Figure 1) secures to the KUDO
®
modular directivity technology that allows the enclosure to be configured with 4
®
Figure 5:
K-LOUVER
w w w . l - a c o u s t i c s . c o m
®
KCOV protective cover in conjunction with the
55° / 55° (110° symmetric)
25° / 55° (80 ° asymmetric - right)
directivity configurations
®
enclosure by inserting both
11 en
11
11
11
EN