Water Connection - Gaggenau RB 491 Instructions D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Water connection

The supply pipe can be located
a)
at the side on the right,
b)
at the side on the left or
c)
underneath.
Legend:
A
Area for installation of the water connection
B
Area for installation of the power connection
12

Publicité

Table des Matières
loading

Table des Matières