Télécharger Imprimer la page

Jaga 041 Instructions D'installation page 49

Publicité

Les langues disponibles

Les langues disponibles

For wall and ceiling installation :
10
Positon the casing and secure the screws at the top and bottom
of the device.
12
Only for ceiling-mounted installation : Slide the clamping plates to the inside of the grid and anchor the grid guard.
7.  DECLARATION OF CONFORMITY
DECLARATION OF CONFORMITY
JAGA N.V. - Verbindingslaan 16 - B 3590, declares under its sole responsibility that the
CEO JAGA N.V.
product to which this declaration relates:
Jan Kriekels
is in conformity with the following standards or documents provided that these are used in
accordance with our instructions:
60335-2-80 BASED ON EN 60335-2-80:2003 + A1:2004 + A2:2009
Following the provision of Directives as amended:
- Low Voltage 2014/35/EC
- EMC 2014/30/EC
- Machinery 2006/42/EC
26/03/2018
JAGA NV | BRIZA 12 - STAND ALONE / BUILT-IN | MANUAL | 2021.01.25 | V_09
11
Install the grille .
BRIZA 12, BRIZA 22
NBN EN 60335-1 BASED ON EN60335-1:2012 + A11:2014 / NBN EN
EN
49

Publicité

loading

Ce manuel est également adapté pour:

Briza 12055H038H052: