6.
INSTALLATION
6.1 TOOLS AND MATERIALS
FOUNDATION BOX PREPARATION
7m
POSITIONING OF PIPES AND DISTRIBUTION BOXES
Digging the trench for the junc�on box. Preparing the junc�on boxes and corrugated pipes necessary for connec�ng to the junc�on
box and the drainage pipe.
i
Dwg. 8876
For installa�ons with double leaf: using a string �ed to the end holes of the founda�on boxes, align all 4 holes on the same plane.
Level the box on the ground and posi�on the pin in line with the upper hinge of the gate. Allow to harden for at least 24 hours.
Clean the inside of the box from any concrete residue.
5 mm
cement
24h
68 mm
0.0
450
450
250
600
5 mm
0.0
ø 25
GB - 24
cement
345
175
ø 32
ø 32
ø 25
600
FOX 724 | FOX 730
Pic. 5
415
Pic. 6
Pic. 7
Pic. 8