Télécharger Imprimer la page

fadini FOX 724 Manuel D'instructions page 24

Publicité

Les langues disponibles

Les langues disponibles

6.
INSTALLATION
6.1 TOOLS AND MATERIALS
FOUNDATION BOX PREPARATION
7m
POSITIONING OF PIPES AND DISTRIBUTION BOXES
Digging the trench for the junc�on box. Preparing the junc�on boxes and corrugated pipes necessary for connec�ng to the junc�on
box and the drainage pipe.
i
Dwg. 8876
For installa�ons with double leaf: using a string �ed to the end holes of the founda�on boxes, align all 4 holes on the same plane.
Level the box on the ground and posi�on the pin in line with the upper hinge of the gate. Allow to harden for at least 24 hours.
Clean the inside of the box from any concrete residue.
5 mm
cement
24h
68 mm
0.0
450
450
250
600
5 mm
0.0
ø 25
GB - 24
cement
345
175
ø 32
ø 32
ø 25
600
FOX 724 | FOX 730
Pic. 5
415
Pic. 6
Pic. 7
Pic. 8

Publicité

loading

Ce manuel est également adapté pour:

Fox 730