Télécharger Imprimer la page

Progress Lighting AirPro COPAN Manuel D'installation page 9

Publicité

Les langues disponibles

Les langues disponibles

Step 4. Once the connection has been made,
the receiver inserts into the down rod hanging
bracket. The canopy comes up to cover the
receiver and bracket. (Fig. 11)
Figure 1 1
An additional safety support is provided to
prevent the fan from falling. Secure the
Support cable to the ceiling joist with screw
and washer. Screw and Support cable holder
lock the fixed Support cable. (Fig. 12)
Figure 1 2
Installing the canopy:
Step 1. Align the locking slots of the canopy
(C) with the two screws (FF) in the mounting
bracket (A). Push up to engage the slots and to
lock in place. (Fig. 13)
Step 2. Rotate the metal cover (D) clockwise
to lock in the bottom of the canopy. (Fig. 12)
Figure 1 3
Installing the Fan blades and Bulbs
Step 1.Install the fan blades (M) onto the fan
motor shaft (P), Put the R-shaped pin (E) into
the motor shaft (P) to lock with a screwdriver
or pliers, Left handed thread on the lock nut
(Q) . Install lock nut (Q) onto the motor shaft
(U) after the fan blades (M) is installed. (Fig.
14) (Fig. 15)
Step 2.Screw light bulbs (F) into the fixture
Sockets (S). (Fig. 14)
Figure 1 4
Figure 1 5
6.

Publicité

loading

Ce manuel est également adapté pour:

P250037