4. Installing the refrigerant piping
4.6. Addition of refrigerant
• Additional charging is not necessary if the pipe length does not exceed 21 m, 70 ft
for A12-A30, 30 m 100 ft for A36, A42.
• Especially, additional charging is not necessary if the pipe length does not exceed
30 m 100 ft for A24, 30, 36, A42 connected to the A-COIL indoor unit (PAA-A18,
24, 30, 36, 42).
• If the pipe length exceeds the specified length above, charge the unit with additional
R410A refrigerant according to the permitted pipe lengths in the chart below.
Max pipe
Model
length
PUZ-A12, 18 30 m, 100 ft
PUZ-A24, 30 50 m, 165 ft *1 30 m, 100 ft
PUZ-A36, 42 50 m, 165 ft *1 30 m, 100 ft
PUY-A12, 18 50 m, 165 ft
PUY-A24, 30 69 m, 225 ft *1 30 m, 100 ft
PUY-A36, 42 69 m, 225 ft *1 30 m, 100 ft
*1. If outdoor unit is connected to the A-COIL indoor unit (PAA-A18, 24, 30, 36, 42), pipe length is "Max. 30 m, 100 ft".
*2. This additional refrigerant chart is used only when connected to an indoor unit other than A-COIL indoor unit (PAA-A18, 24, 30, 36, 42). Additional charging is not necessary
if the pipe length does not exceed 30 m 100 ft for A24, 30, 36, A42 connected to the A-COIL indoor unit (PAA-A18, 24, 30, 36, 42).
5. Drainage piping work
Outdoor unit drainage pipe connection
When drain piping is necessary, use the drain socket or the drain pan (option).
Drain socket
Drain pan
6. Electrical work
6.1. Outdoor unit (Fig. 6-1, Fig. 6-2)
1 Remove the service panel.
2 Wire the cables referring to the Fig. 6-1 and the Fig. 6-2.
B
L1 L2 GR
S1
S2
S3
en
E
D
For Power
For Power
D
B
A
E
E
7
Max height
21 m
24 m
27 m
30 m
difference
70 ft
80 ft
90 ft
100 ft
0.06 kg
0.11 kg
0.17 kg
30 m, 100 ft
0
2 oz
4 oz
6 oz
0.20 kg
0.40 kg
0.60 kg
0
7 oz
14 oz
21 oz
0
0
0
0
0.03 kg
0.06 kg
0.09 kg
30 m, 100 ft
0
1 oz
2 oz
3 oz
0.09 kg
0.17 kg
0.26 kg
0
3 oz
6 oz
9 oz
0
0
0
0
A12, A18
A24, A30
PAC-SJ08DS-E
PAC-SG63DP-E
PAC-SG64DP-E
S1
S2
A
S3
E
C
A Indoor unit
B Outdoor unit
C Remote controller
D Main switch (Breaker)
E Earth
A
C
E
Fig. 6-1
Notes:
1. When the unit is stopped, charge the unit with the additional refrigerant through
the liquid stop valve after the pipe extensions and indoor unit have been vacu-
umized.
When the unit is operating, add refrigerant to the gas check valve using a
safety charger. Do not add liquid refrigerant directly to the check valve.
2. After charging the unit with refrigerant, note the added refrigerant amount on
the service label (attached to the unit).
Refer to the "1.5. Using R410A refrigerant air conditioners" for more informa-
tion.
• Be careful when installing multiple units. Connecting to an incorrect indoor unit
can lead to abnormally high pressure and have a serious effect on operation per-
formance.
Additional refrigerant charging amount (kg/oz) *2
34 m
37 m
40 m
43 m
46 m
110 ft
120 ft
130 ft
140 ft
150 ft
-
-
-
-
-
0.79 kg
0.99 kg
1.19 kg
1.39 kg
1.59 kg
28 oz
35 oz
42 oz
49 oz
56 oz
0.20 kg
0.40 kg
0.26 kg
0.79 kg
0.99 kg
7 oz
14 oz
21 oz
28 oz
35 oz
0.11 kg
0.14 kg
0.17 kg
0.20 kg
0.23 kg
4 oz
5 oz
6 oz
7 oz
8 oz
0.34 kg
0.43 kg
0.51 kg
0.60 kg
0.68 kg
12 oz
15 oz
18 oz
21 oz
24 oz
0.09 kg
0.17 kg
0.26 kg
0.34 kg
0.43 kg
3 oz
6 oz
9 oz
12 oz
15 oz
A36, A42
PAC-SG61DS-E
PAC-SH97DP-E
A12, A18
C
A24-A42
A
C
D
E
A Earth terminal
B Terminal block
C Clamp
D Service panel
49 m
50 m
52 m
55 m
58 m
160 ft
165 ft
170 ft
180 ft
190 ft
-
-
-
-
-
1.79 kg
1.89 kg
-
-
-
63 oz
67 oz
1.19 kg
1.29 kg
-
-
-
42 oz
46 oz
0.26 kg
0.27 kg
-
-
-
9 oz
10 oz
0.77 kg
0.81 kg
0.85 kg
0.94 kg
1.02 kg
27 oz
29 oz
30 oz
33 oz
36 oz
0.51 kg
0.55 kg
0.60 kg
0.68 kg
0.77 kg
18 oz
20 oz
21 oz
24 oz
27 oz
B
A
F
L1
L2
E
B
L1
L2
GR
E Wire the cables so that they do not
contact the center of the service panel
or the gas valve.
Fig. 6-2
61 m
64 m
67 m
69 m
200 ft
210 ft
220 ft
225 ft
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1.11 kg
1.19 kg
1.28 kg
1.32 kg
39 oz
42 oz
45 oz
47 oz
0.85 kg
0.94 kg
1.02 kg
1.06 kg
30 oz
33 oz
36 oz
38 oz
GR
S1 S2 S3
S1 S2 S3