1.3 Replacement Parts
See Figure 1.1 and Figure 1.2 below.
1.3.1 Additional Components Required
•
Sheet metal screws to match number of joints
•
Variable speed control, switch, electrical wire, electri-
cal boxes, wall plate as required. See section 3.1, Elec-
trical Requirements on page 13 for speed control or
switch requirements.
•
Optional 3.25" x 10" x 6" diameter right angle boot
(for adapting to wall stack)
•
Optional 3.25" x 10" rectangular wall stack and S drive
cleats when required
Figure 1.1, Kit Components
HTK-INT
1.3.2 Heat Transfer Kit Air Chute
•
The HTK air chute is required when isntalling a #HTK-
INT
•
(1) air chute is needed per heat transfer kit. Exception
is with the Callaway See Thru that uses (1) air chute
for up to (2) #HTK-INT
•
Order model specific air chute. Yours may look differ-
ent than what is shown in Figure 1.2
Figure 1.2, HTK Air Chute & Collar
4
Rev. 14 — April 2024