Installation method (continued)
6. When changing the direction of the out
door side duct (EA/OA) ···Except for LGH-
F1200RVX-E
(1) Removal of flange cover
Unscrewing the flange cover mounting screws (4 pcs), remove
the flange cover.
Ceiling suspension fixture
Flange cover
Mounting screw
(for flange cover)
(2) Installation of duct connecting flange
1. Install the duct connecting flange using attached mounting screws.
2. Fix the removed flange cover with the removed mounting
screws (4 pcs).
Duct connection flange
Mounting screw
(Accessory parts)
Eng-6
Ceiling suspension fixture
Electrical installation
With this product, the wiring installation method will vary according to
the design of the system.
Perform electrical installation to meet local electrical regulations.
* Always use double insulated PVC cable for the transmission cables.
* Wiring work must be performed by qualified professionals.
* All supply circuits must be disconnected before obtaining access to
the terminal devices.
Names of components in control box
TM3
TM4
TB5
TM2
CAUTION
• Do not pull out preconnected connectors unnecessarily
during installation.
LED3
LED1, 2, 4
SW2, SW5, SW7
SA1, SA2
TM1