Installation (Space)
that the installation of pipe-work shall be kept to a minimum;
that pipe-work shall be protected from physical damage and shall not be installed in an unventilated space;
that compliance with national gas regulations shall be observed;
that mechanical connections shall be accessible for maintenance purposes;
Maximum refrigerant charge amount (M): 0.19kg
Dispose of refrigerant based on local regulations, properly processed;
Minimum oor area of the room: 10 m
Keep ventilation openings clear of obstruction;
An unventilated area where the appliance using ammable refrigerants is installed shall be so constructed that should any
refrigerant leak, it will not stagnate so as to create a re or explosion hazard. This shall include:
the appliance shall be stored in a well-ventilated area where the room size corresponds to the room area as spec d for
operation;
the appliance shall be stored in a room without continuously operating open ames (for example an operating gas appliance)
and ignition sources (for example an operating electric heater).
The appliance shall be stored so as to prevent mechanical damage from occurring.
Information on servicing
Information about the credentials of qualified service personnel as follows.
– Any person who is involved with working on or breaking into a refrigerant circuit should hold a current valid certificate from an
industry-accredited assessment authority, which authorises their competence to handle refrigerants safely in accordance with
an industry recognised assessment specification.
– Servicing shall only be performed as recommended by the equipment manufacturer. Maintenance and repair requiring the
assistance of other skilled personnel shall be carried out under the supervision of the person competent in the use of flammable
refrigerants.
Checks to the area
Prior to beginning work on systems containing flammable refrigerants, safety checks are necessary to ensure that the risk of
ignition is minimised. For repair to the refrigerating system, the following precautions shall be complied with prior to conducting
work on the system.
Work procedure
Work shall be undertaken under a controlled procedure so as to minimise the risk of a flammable gas or vapour being present while
the work is being performed.
General work area
All maintenance staff and others working in the local area shall be instructed on the nature of work being carried out. Work in
confined spaces shall be avoided. The area around the workspace shall be sectioned off. Ensure that the conditions within the area
have been made safe by control of flammable material.
2
6