Télécharger Imprimer la page

GASLAND Chef Pro CH1212BS Instructions D'installation page 20

Publicité

Les langues disponibles

Les langues disponibles

18
Important:
If the cooktop is being installed into a blind counter(one with no cabinet opening
below), wire connections must be made before putting the cooktop into the cutout
opening.
1. Pre-test checklist
A. Remove all protective film, if present, and anystickers.
B. Check to be sure that all wiring is secure and not pinched or in contact with
moving parts.
C. Check level of appliance.
D. Check that the cooktop is properly grounded.
2. Operation checklist
A. Remove all items from the top of the cooktop surface.
B. Turn on the power to the cooktop. Verify that all surface burners operate
properly.
C. Check that the circuit breaker is not tripped nor the house fuse blown.
D. Check that conduit is securely connected to the junction box.
E. See troubleshooting list.
Note to electrician:
The power leads supplied with this appliance for connections to larger gauge
household wiring. The insulation of these leads is rated at temperatures much
higher than the temperature rating of household wiring. The current carrying
capacity of a conductor is governed by the wire gauge and also
the temperature rating of the insulation around the wire.
Note: ALUMINUM WIRING
• WARNING: IMPROPER CONNECTION OF ALUMINUM HOUSE WIRING TO
THE COPPER LEADS CAN RESULT IN A SERIOUS PROBLEM.
• Splice copper wires to aluminum wiring using special connectors designed for
joining copper to aluminum and follow the manufacturer's recommended
connector procedure closely.
Note: Wire used, location and enclosure of splices, etc., must conform to good
wiring practice and local codes.
1 (844) 538-7890
support@gaslandchef.com
www.gaslandchef.com
8350 Patriot Blvd STE B, N. Charleston, SC 29418

Publicité

loading