Télécharger Imprimer la page

Flint & Walling Rolled Shell Patriot Serie Instructions Pour L'installation Et L'utilisation page 5

Publicité

Les langues disponibles

Les langues disponibles

ASSEMBLY INSTRUCTIONS
Follow step 1a and 1b below for Schedule 80 pipe
or step 2a and 2b for black poly pipe.
Schedule 80 pipe (recommended)
1a. Apply thread tape and then thread the pipe
directly into the pump discharge and tighten. For
1 in. pipe, you will also need a 1-1/4 in. x 1 in.
reducer bushing, not shown. (Fig. 1a)
1b. Slide the two hose clamps packaged with the
torque arrestor over the end of a short piece
of Schedule 80 pipe (approximately 4 ft. long).
The pump will be easier to handle if a short
piece is installed first. Continue to Step 3.
(Fig. 1b)
Black poly pipe
2a. Apply thread tape and thread a 1-1/4 in. male
barbed adaptor into the top of the pump and
tighten. If using 1 in. black poly pipe, install a
1-1/4 in. x 1 in. reducer bushing as shown. (Fig.
2a)
2b. Clamp pipe onto barbed end of male adaptor
with two hose clamps. (Fig. 2b)
1a
1b
2a
2b
5
Copyright © 2023 Flint & Walling. All rights reserved.
Schedule
80 Pipe
Submersible
Pump
Torque
Arrestor
1-1/4 in.
male
barbed
adapter
1-1/4 in x
1 in.
reducer
bushing
IL1171

Publicité

loading

Produits Connexes pour Flint & Walling Rolled Shell Patriot Serie

Ce manuel est également adapté pour:

Commander s serieG serie