Télécharger Imprimer la page

Flint & Walling Rolled Shell Patriot Serie Instructions Pour L'installation Et L'utilisation page 13

Publicité

Les langues disponibles

Les langues disponibles

PRESSURE TANK INSTALLATION
9. Add additional couplings, unions and pipe (all
sold separately) as necessary to reach the pump.
(Fig. 9)
NOTE: Schedule 80 pipe recommended
ELECTRICAL HOOKUP FROM THE HOUSE TO PUMP AND PRESSURE TANK
For - 2-Wire Pumps - No Control Box Required.
WARNING: This equipment is intended for installation by technically qualified personnel. Failure to
install it in compliance with national and local electrical codes may result in electrical shock or fire hazard,
unsatisfactory performance, and equipment failure.
WARNING: Always disconnect power source before working on or near the pump, its connected load
and wiring. If the power disconnect is out of sight, lock it in the open position and tag to prevent unexpected
application of power.
1. Determine proper voltage from breaker box to
pressure switch. (Fig. 1)
9
1
13
Copyright © 2023 Flint & Walling. All rights reserved.
Schedule 80 Pipe Shown
IL1170
50 60
40
30
70
20
80
10

Publicité

loading

Produits Connexes pour Flint & Walling Rolled Shell Patriot Serie

Ce manuel est également adapté pour:

Commander s serieG serie