Opening The Device; Mounting The Device On The Wall - Mennekes AMTRON Compact 3,7 / 11 C2 Manuel D'utilisation Et D'installation

Masquer les pouces Voir aussi pour AMTRON Compact 3,7 / 11 C2:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 69
Residual current circuit breaker
The required residual current device must be incor-
porated in the indoor installation (in accordance with
IEC 60364-7-722 (in Germany in accordance with
DIN VDE 0100-722)).
„ The device has a differential current sensor
for DC residual current monitoring > 6 mA
with tripping characteristics in accordance
with IEC 62752.
„ At least one dedicated type B residual cur-
rent circuit breaker has to protect the device
if it is subject to the scope of IEC 60364-7-
722:2018.
„ At least one dedicated type A residual cur-
rent circuit breaker has to protect the device
if it is subject to the scope of HD 60364-7-
722:2016.
„ No other circuits may be connected to this
residual current circuit breaker.
„ Compliance with national regulations is man-
datory.

5.4 Opening the device

1
1
Fig. 5: Opening the device
12
When delivered, the front enclosure part (2) is not
attached with screws. The screws (1) are stored in the
enclosed accessory bag.
f Switch off the power supply.
f Unscrew screws (1) if necessary.
f Fold the upper housing section (2) downward.

5.5 Mounting the device on the wall

T
T
Device damage due to an uneven surface
If the device is mounted on an uneven surface the under-
part of the enclosure can warp. In this case the specified
protection class is no longer ensured. Consequential dam-
age of electronic components can occur.
f Only mount the device on level surfaces.
f If necessary, level out uneven surfaces with suitable
measures.
In the packaging box of the device, a drilling template,

including a water level with instructions to help with
horizontal mounting are included.
1
2
1
At low minus temperatures, the device should be
temporarily stored for 24 hours at room tempera-
ture before installation and commissioning.
ATTENTION

Publicité

Table des Matières
loading

Table des Matières