Hansgrohe Axor Montreux 16570 1 Série Instructions De Montage / Mode D'emploi / Garantie page 8

Masquer les pouces Voir aussi pour Axor Montreux 16570 1 Série:
Table des Matières

Publicité

1
2
1
1
8

12 mm
English
Rough In
Rough in ½" female fittings, recessed ⅜" behind the
surface of the finished wall, for the hot and cold sup-
plies — see the diagrams.
The hot supply must be on the left
and the cold supply must be on
the right.
If the supplies are reversed, the
themostatic mixing valve cannot
function correctly.
Installation
Wrap the threads on the ball-s connections with
Teflon thread tape.
Install the connections.

Publicité

Table des Matières
loading

Table des Matières