Télécharger Imprimer la page

Kostal Smart Energy Meter G2 Manuel D'installation page 102

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 172
Installation instructions
2.
Connect wires to the KOSTAL Smart Energy Meter.
n
With a three-phase mains grid, connect the external wires L1, L2 and
L3 and neutral wire N to the KOSTAL Smart Energy Meter as shown in
the connection diagram.
n
With a single-phase mains grid, connect the external wire L1and
neutral wire N to the KOSTAL Smart Energy Meter as shown in the
connection diagram.
n
Ensure that each of the phases is assigned correctly. If this is not the
case, the Energy Manager will provide incorrect measuring values.
Please note the following:
n
Connection cross-section: 10-25 mm
n
Torque for screw terminals: 2.0 Nm
102
2,0 Nm
10-25 mm²
2
10 mm
© 2022 KOSTAL Solar Electric GmbH

Publicité

loading

Produits Connexes pour Kostal Smart Energy Meter G2

Ce manuel est également adapté pour:

Ksem-g2