Important; Supplies Required - Bradley S1944022ABC Manuel D'installation

Douche à main pour les yeux, le visage et le corps
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

S1944022ABC
Read this installation manual completely to ensure proper installation, then file it with the
Installation
owner or maintenance department. Compliance and conformity to drain requirements and
other local codes and ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before discarding
Packing List
any packaging material. If any parts are missing, do not begin installation until you obtain
IS
T H
E
S ID
the missing parts.
U P
Flush the water supply lines before beginning installation and after installation is complete.
Test the unit for leaks and adequate water flow. Main water supply to the eyewash should be
"ON" at all times. Provisions shall be made to prevent unauthorized shutoff.
The ANSI Z358.1 standard requires an uninterrupted supply of flushing fluid. Bradley
plumbed emergency fixtures require a minimum of 30 PSI (0.21 MPa) flowing pressure.
Flushing fluid should be tepid per ANSI Z358.1.
The inspection and testing results of this equipment should be recorded weekly to verify
proper operation. This equipment should be inspected annually to ensure compliance with
ANSI Z358.1.
Workers who may come in contact with potentially hazardous materials should be trained
regarding the placement and proper operation of emergency equipment per ANSI Z358.1.
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY
FAX: (262-251-5817)
http://www.bradleycorp.com
114-051
For questions regarding the operation or installation of this product, visit www.bradleycorp.
com or call 800.BRADLEY (800.272.3539).
Product warranties and service parts information may also be found under "Products" on our
web site at bradleycorp.com.
NOTICE!
Avoid cleaners containing organic solvents, alcohols, and hydrocarbons.
Rinse with water after cleaning.

Supplies Required:

• Teflon tape and/or pipe sealant
• ½" NPT water supply inlet (30–90 psi)
• (2) ¼-20 screws (stainless steel recommended) and anchors
• Sign-mounting hardware
• Backflow prevention device as required by UPC, IPC and/or local plumbing codes
Local codes may require the installation of a backflow prevention valve to complete proper installation. Compliance with
local codes is the responsibility of the installer. Valve must be tested annually to verify that it is functioning properly.
Backflow prevention valves are not included with the fixture and may be supplied by the contractor or purchased from
Bradley Corporation.
2

IMPORTANT

7/29/2014
Bradley • 215-1694 Rev. C; ECN 14-05-013
Installation

Publicité

Table des Matières
loading

Table des Matières