Read this installation manual completely to ensure proper installation, then file it with the
Installation
owner or maintenance department. Compliance and conformity to drain requirements and
other local codes and ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before discarding
Packing List
any packaging material. If any parts are missing, do not begin installation until you obtain
IS
T H
E
S ID
the missing parts.
U P
Flush the water supply lines before beginning installation and after installation is complete.
Test the unit for leaks and adequate water flow. Main water supply to the eyewash should be
"ON" at all times. Provisions shall be made to prevent unauthorized shutoff.
The ANSI Z358.1 standard requires an uninterruptible supply of flushing fluid at a minimum
30 PSI (0.21 MPa) flowing pressure. Flushing fluid should be tepid per ANSI Z358.1.1.
The inspection and testing results of this equipment should be recorded weekly to verify
proper operation. This equipment should be inspected annually to ensure compliance with
ANSI Z358.
Workers who may come in contact with potentially hazardous materials should be trained
regarding the placement and proper operation of emergency equipment per ANSI Z358.1.
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY
FAX: (262-251-5817)
http://www.bradleycorp.com
114-051
For questions regarding the operation or installation of this product, visit www.bradleycorp.
com or call 1-800-BRADLEY.
Product warranties may also be found under "Product Information" on our web site at www.
bradleycorp.com.
Installation
Supplies Required:
3
• (3)
" wall fasteners and bolts
8
• Pipe sealant
• Piping to ½" NPT water supply inlet on unit
• Piping to 1¼" drain outlet for eyewash
• Sign-mounting hardware
NOTE: Local codes may require the installation of a backfl ow prevention valve to complete proper installation. Compliance with local
codes is the responsibility of the installer. Valve must be tested annually to verify that it is functioning properly. Backfl ow prevention valves
are not included with the fi xture and may be supplied by the contractor or purchased from Bradley Corporation.
Step 1: Install inlet drain fitting
NOTE: The top of the eyewash heads should be 33"–45" (838mm–1143mm) from the floor.
1. Position the inlet drain fitting over the 1¼" drain outlet pipe from wall.
2. Using the inlet drain fitting as a template, mark the bolt hole locations on wall OR install four suitable fasteners (supplied by installer)
3
for
" bolts in the wall at the marked hole locations.
8
3. Bolt the eyewash bracket to the wall or wall fasteners using
Step 2: Assemble components
1. Assemble the remaining eyewash components as shown on page 4 (S19-220ABF) or page 5 (S19-220BBF).
• Apply pipe sealant (supplied by installer) to all male-threaded pipe joints.
• Use a strap wrench around pipes when tightening to prevent pipe marring.
Step 3: Connect water supply
1. Connect the water supply piping to the ½" NPT inlet on the eyewash (piping supplied by installer).
2. Connect the drain piping (supplied by installer) to the 1¼" drain outlet on the eyewash.
3. Mount the safety sign to the wall using sign-mounting hardware (supplied by installer).
2

IMPORTANT

3
6/9/09
" bolts (supplied by installer).
8
Bradley Corporation • 215-158ABF Rev. J; ECM 08-539