5
Upper Flue Must Be In Place
Before Proceeding
21
22
7.1a
12g
7.1
7.1b
12c
After the regulation for height adjustment, insert
2.1
the upper chimney stack from above, and leave it
2
running free on the frame.
2.2
7
12c
1
12f
23
11
12h
9.1
9
25
12e
24
12c
6
Only for Ducted Venting
21
Installation
22
7.1a
12g
7.1
7.1b
12c
Install Damper that is included with the Hood before
connecting to the ductwork.
2.1
2
2.2
Now take either your woods screws or bolts
depending on your set-up and screw all four
into the pilot holes and leave 1/4" of the
heads exposed.
12c
Next install a UL or CSA listed strain relief
in the wiring box so that the screws can
1
be tightened after the chimney support is
attached to the ceiling.
Now lift the chimney support into it's final
position and feed the electrical supply through
the strain relief.
Next position the chimney support so that
12f
the large end of the keyhole slots are over
the ceiling attachment screws or bolts. Then
push the chimney support so that the bolts
are in the neck of the slots. Tighten all four
screws or bolts securely.
• The frame mountings must be secure to
withstand the weight of the hood and any
stresses caused by the occasional side
thrust applied to the device. On completion,
check that the base is stable, even if the
frame is subjected to bending.
• In all cases where the ceiling is not
strong enough at the suspension point,
the installer must provide strengthening
using suitable plates and backing pieces
anchored to the structurally sound parts.
23
11
12h
9.1
25
12e
24
12c
10
9