Télécharger Imprimer la page

Kohler K-1914 Guide D'installation page 2

Publicité

Les langues disponibles

Les langues disponibles

Important Information
Read all instructions before using or installing this product.
WARNING: When using electrical products, basic precautions should always be followed,
including the following:
DANGER: Risk of electric shock. Connect only to a circuit protected by a Ground-Fault
Circuit-Interrupter (GFCI) or Residual Current Device (RCD). Grounding is required. The unit
should be installed by a qualified service representative and grounded.
WARNING: Risk of electric shock. A licensed electrician must route all electrical wiring and
connections for this product. Improper installation will create an electrical hazard and may not
comply with local building and electrical codes.
WARNING: Risk of electric shock. Disconnect power before servicing.
IMPORTANT! Please read all instructions thoroughly before beginning installation, including the
following requirements.
WARNING: Risk of property damage. Building materials and wiring should be routed away from
the blower motor body and other heat-producing components of the unit.
NOTICE: Follow all local plumbing and electrical codes.
Product Information
Electrical Requirements
WARNING: Risk of burns, fire, electric shock, or injury to persons. Do not operate the blower if
the blower supply cord is damaged. For proper guidance to have this product repaired, please call:
1-800-4KOHLER from within the USA and Canada, or 001-800-456-4537 from Mexico.
NOTE: If the supply cord is damaged, it must be replaced by the manufacturer, its service agent, or
similarly qualified persons in order to avoid a hazard.
The installation must have a Class A Ground-Fault Circuit-Interrupter (GFCI) or Residual Current Device
(RCD). The GFCI or RCD protects against line-to-ground shock hazard. Use a 120 V, 15 A, 60 Hz dedicated
service for the bath with airjets.
Product Notices
NOTICE: Keep the area around the blower motor clean and free of debris. Ensure that the area around the
blower motor is free of sawdust, insulation, dirt, or other small loose debris. Such material could clog the
blower motor air ducts and reduce the air flow through the blower.
Factory-Assembled Features
Factory installed components include blower motor with power supply cord, check valve, air piping, user
keypad, and keypad cable. Other than power wiring and plumbing, no assembly is needed.
Connections and Service Access
NOTICE: Provide unrestricted service access to the blower motor and check valve. The access must be
located immediately next to the blower motor. Study the roughing-in information packed with the bath.
Before installation, ensure that there is proper access to the blower motor and final connections. If the blower
motor is installed in an enclosed area, an access panel is required at the blower motor. This panel should be
1128535-2-B
2
Kohler Co.

Publicité

loading