4. Secure to the Subfloor - Standard
CAUTION: Risk of product damage. Do not lift the bath with airjets by the piping or blower
motor, or use the piping or blower motor for structural support of the bath.
CAUTION: Risk of product damage. Do not support the bath with airjets by the rim.
NOTICE: The bath must be secured using one of the following three methods: cement or mortar bed,
construction adhesive, or silicone sealant. Choose the installation option that best applies to your
particular installation. Follow the appropriate instructions.
NOTICE: Ensure the subfloor is level before proceeding. If necessary, use shims to achieve level.
Cement or Mortar Bed Method
NOTICE: Do not use gypsum cement or drywall compound, as these materials will not provide a durable
bond. Only use cement or mortar.
Spread a 2" (5.1 cm) thick later of cement or mortar on the subfloor except where the leveling blocks
will be located.
Clear any cement or mortar away from the leveling block locations.
Place a plastic liner or similar material over the cement or mortar.
With help, carefully move the bath into the installation area. Make sure the blower motor control
and leveling blocks do not rest in the bed material.
Verify the leveling blocks are resting directly on the subfloor. Reposition as needed.
Verify the bath is level across the top of the bath. If the bath is not level, shims must be used under
the leveling blocks.
Connect the drain tailpiece to the trap.
Remove the protective tape from the rim.
Apply a continuous bead of high-quality silicone sealant around the entire rim of the bath. Allow
the sealant to cure as per the manufacturer's instructions.
Construction Adhesive Method
Apply a generous amount of high-quality construction adhesive to the bottom of the leveling blocks.
With help, carefully move the bath into the installation area.
Verify the leveling blocks are resting directly on the subfloor. Reposition or shim as needed.
Verify the bath is level across the top of the bath. If the bath is not level, shims must be used under
the bath.
Connect the drain tailpiece to the trap.
Kohler Co.
All manuals and user guides at all-guides.com
Spread a 2" (5.1 cm)
layer of cement or
mortar bed material.
Clear spaces
for leveling
blocks.
9
Apply a bead of
silicone sealant
around the entire
rim.
OR
Apply construction
adhesive to the
leveling blocks.
1035472-2-G