Télécharger Imprimer la page

Napoleon B81NS Instructions D'installation Et D'opération page 4

Publicité

Les langues disponibles

Les langues disponibles

4
2.5
PORCELAIN BASE INSTALLATION
INSTALL IN THE FOLLOWING ORDER:
EN
A.
Side porcelain panels or brick panels must
be installed prior to porcelain base cover
plates. For side porcelain panel installation
see "PRP81 PORCELAIN REFLECTIVE
RADIANT PANEL" leafl et and for brick panel
installation see "GD844KT DECORATIVE
BRICK PANEL - SANDSTONE" leafl et.
B.
Slide the porcelain cover plates through
the front opening being careful not to
scratch the porcelain panels. The cover
plates must slide under the burner cover
as shown. Secure to the burner base with
the screws provided and repeat on other
side. Porcelain wire shields sit on the cover
plates as illustrated.
2.6
BURNER COVER INSTALLATION
A.
Lower the burner cover down onto the
burner tray and porcelain base, making
sure the pilot is properly seated through
the slot on the right side.
B.
Attach burner cover with four screws as
illustrated.
C.
Empty the sand into the burner tray.
Spread the sand evenly over the burner
tray.
W415-0808 / D / 11.04.16
PORCELAIN
COVER PLATE
PORCELAIN
WIRE SHIELD

Publicité

loading

Ce manuel est également adapté pour:

B81ps