4. Control Panel and LCD Operations
4.2 LCD Screen Description
4.2.1 Initial Screen
Upon powering on, the UPS will execute POST (Power-On Self-Test). The initial screen (shown below) will display for approximately 5
seconds.
4.2.2 Main Screen
After initialization, the main screen will display.
The Main Screen is divided into six sections:
1
UPS Operation Mode: Shows UPS current operation mode and status.
2
UPS Flow Chart: Shows current flow chart and measurement data.
3
Main Menu: Touch each icon to enter submenu. Refer to Figure 4.4 for menu tree.
HOME
4
UPS Power Rating: Shows UPS power rating.
5
Date and Time: Shows current date and time.
1
6
CONTROL
MEASUREMENT
Online UPS
Figure 4.2 Initial Screen
2
3
Figure 4.3 Main Screen
Main
SETUP
Figure 4.4 Menu Tree
22
4
5
2018/01/01
INFORMATION
EVENTS