Télécharger Imprimer la page

Progress Lighting AirPro P250038 Manuel D'installation page 9

Publicité

Les langues disponibles

Les langues disponibles

Finishing the Installation
Step 1. Tuck connections neatly into ceiling
outlet box.
Step 2. Slide the canopy up to mounting bracket
and place the key hole on the canopy over the
screw on the mounting bracket, turn canopy until
it locks in place at the narrow section of the key
holes. (Fig. 10)
Step 3. Align the circular hole on canopy with the
remaining hole on the mounting bracket, secure
by tightening the two set screws. Note: Adjust the
canopy screws as necessary until the canopy and
canopy cover are snug.
WARNING
Make sure the notch on the hanging bracket
properly sits in the groove in the hanger ball
before attaching the canopy to the bracket by
turning the housing until it drops into place.
Outlet box
Hanger
bracket
Figure 10
Attaching the Fan Blades
Step 1. Insert the blade through the slot in the
housing. Align the holes in the blade and the fan
motor assembly and secure with the blade support
and blade screw with lock washer. (Fig. 11)
Screws
Step 2.Repeat these steps for the remaining
blades.
Canopy
Canopy cover
Figure 11
Blades
Blade support
plate
Screws
6.

Publicité

loading