FCU PICV KIT
APPLICATION
The FCU PICV Kits are fac tory assembled and tested units
for immediate installation on a Fan Coil Unit/VAV
Equipment. These valve sets are available in different
sizes, as mentioned in below table:
OS Numbers
Sizes
VPI015TPL2-KIT
DN15 (1/2)
VPI015TPH2-KIT
DN15 (1/2)
VPI020TPL2-KIT
DN20 (3/4)
VPI020TPH2-KIT
DN20 (3/4)
VPI025TPH2-KIT
DN25 (1)
VPI032TPH2-KIT
DN32 (1-1/4)
The FCU PICV Kit includes 3 main parts:
— The bypass unit itself with two 3 way posi tion ball
valves
— A strainer including blow-down valve on the inlet
side to the coil
— A PICV with pressure/temperature plugs on the outlet
side.
Installation and Flushing
1. The FCU PICV Kit comes pre-assembled and pre-
tested from the factory, allowing fast plug and play
on site. Connect the strainer side to inlet of the coil
and the PICV side to outlet of the coil. If required, it is
possible to order the FCU PICV Kits with flex hoses .
2. For both flushing and normal operation, use
treated, clean, and debris-free water according to
VDI2035.
Figure 1. Bypass Operation
® U.S. Registered Trademark
Copyright © 2022 Honeywell Inc. • All Rights Reserved
INSTALLATION INSTRUCTIONS
3. Set the bypass handles to Bypass Operation and
flush the main system without com promising
coil components.
4. For terminal flushing, both forward and back
flushing is possible, either through the coil or
around the coil, according to the BSRIA
BG29/2021. Choose your flushing procedure
according to local standards and requirements.
For FORWARD FLUSHING, connect the hose to blow-down
valve (
) on the strainer and slowly open the inlet bypass
handle (
) by turning it 90° to pressurize the coil. Open the
blow-down valve (
Close the bypass handle again, close the blow-down valve,
and disconnect the hose.
Alternatively, perform forward flushing through the coil
following the above procedure, but connect the hose to
the combination p/t drain (
1
1
Figure 2. Forward Flushing
For BACK FLUSHING, connect the hose to blow-down valve
(
) on the strainer, slowly open the inlet bypass handle
(
)to pressurize the coil, and turn it 180°. Open the
blowdown valve (
the bypass handle again, close the blowdown valve, and
disconnect the hose.
Printed in Mexico
) and forward flush around the coil.
) on the PICV valve.
2
3
) and back flush around the coil. Close
31-00103M-01