Installation
Installation operations, gas or voltage conversions to other than the original, starting up the
installation or appliance, ventilation, letting out fumes, and maintenance must be done following the
manufacturer's instructions and observing the norms in force, by qualified personnel, in compliance
with the following provisions (GB):
 Health and Safety at Work Act, 1974
 Codes of Practice, BS6173, 1982
 The Building Regulations, 1985
 The Building Standards Regulations, 1981
For others countries follow the relevant local rules for:
 Building regulations and local fire prevention provisions
 Safety norms in force
 The Electrical Norms in force
 The Fire Brigade rules
INSTALLATION
Preliminary operations
Remove the appliance from its packaging and ensure that it is intact; if in doubt, do not use it but
contact professionally qualified personnel. The packaging materials are compliant with environmental
safety regulations. They can be stored without risk, or else should be disposed of in accordance with
current national regulations, in particular those regarding nylon bags and polystyrene.
After verifying that the appliance is in good conditions, the protective film may be removed. Clean the
external parts of the appliance carefully with warm water and detergent, using a cloth to remove all
remaining residues, and then dry it with a soft cloth. If there are still traces of glue, they can be removed
using a suitable solvent (e.g. acetone). Under no circumstances should abrasive substances be used.
After the installation the appliance should be levelled by lowering or raising the adjustable legs.
Electric connection
Before connecting the appliance, it is necessary to check that the voltage of the power supply
available corresponds to the voltage the appliance has been set for. In the event that they do not
correspond, it is necessary to modify the connection as shown in the electric diagram, if voltage
change is provided for. The terminal blocks are situated behind the instrument board and they can
be removed unscrewing the 2 screws that fix the support. Before connecting the cable to the
terminal blocks, it is necessary to let it pass through the cable gland (fig. 2 at page 2). If the supply
cord is damaged, it must be replaced by the manufacturer, its service agent or similarly
qualified persons in order to avoid a hazard.
Furthermore, the efficiency of the earth connection must be checked, and also that the earth
conductor on the connecting side is longer than the other conductors, and that the connecting cable
has a wire bunch adequate for the power absorbed by the appliance and is at least type H07 RN-F.
As in international provisions, before installing the appliance a unipolar device must be
installed with a contacts opening of at least 3mm which must not interrupt the YELLOW-
GREEN earth wire. The device must be installed near the appliance, it must be approved and have
adequate capacity for the absorption of the appliance (see technical features).