Mounting The Duct Cover Bracket; Ceiling / Wall Ducting - Elica VARNA 30 Guide D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Mounting the duct cover bracket

Option A - Fixed heigh duct cover
From the horizontal line traced in the previous section,
trace a horizontal parallel line as shown below.
Center the bracket in the top horizontal line and align it
with the centerline, as described in the followinG
drawing.
Centerline
Bracket line
27
/
"
28
32
Mark screw holes locations in the wall.
IMPORTANT. Check to be sure that holes locations are
leveled, and correctly centered by the vertical centerline.
Drill 5/16" pilot holes in the marked locations.
Install wall fastener anchors.
Drive wood screws, by hand, into the fasteners to allow an-
chors to expand. Remove screws.
Secure the bracket to the wall with wood screws and/or
fasteners.
Option B - Telescopic duct cover
The duct bracket should be installed against the back wall
and flush with the ceiling. This bracket will hold the
duct cover in place at the top (this a extra accessory available
not included with the hood).
Secure the bracket to the wall:
Align the marked centerline on the bracket with the
centerline on the wall.
Mark 2 screw hole locations in the wall.
Drill 5/16" pilot holes in the marked locations.
Install wall fastener anchors.
Drive wood screws, by hand, into the fastener to allow
anchors to expand. Remove the screws.
Secure the bracket to the wall with wood screws and/or
fasteners.
Horizontal straight pencil marked line
Desired installation height
Ceiling ducting
If the duct will vent straight up to the ceiling:
Use level to draw a line straight up, from the centerline on
the template to the ceiling.
Measure at least 4 -12/16 " from the back wall to the circle
center of an 6-½" hole on the ceiling.
Wall ducting
If ductwork will vent to rear:
Use a level to draw a line straight up from the centerline
on the template.
Measure at least 23 - 12/16" (the measure might vary
dependig on the elbow used) above the pencil line that]
indicates the bottom installation height, to the circle center
of an 6-½" diameter duct hole (Hole may be elongated for
duct elbow).
House wiring location
The junction box is located on the top left side of the hood.
Wiring should enter the back wall at least 20" above the
bottom of the installation height, and within 5-7/8" and
4-7/8"of the left side of the centerline.
4
/
" circle center
12
16
to wall
6½" diameter hole
FOR WALL VENT DUCT
7
Wall
For ceiling vent ducting
Ceiling
Circle center at
23
/
" above the
12
16
marked bottom
pencil line
Horizontal straight
pencil line

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Varna 36Evr630s2Evr636s2

Table des Matières