LVQD2
11
Control Box and Valve Installation
Secure control box to
A
underside of bowl using
(2) #10 x 1/2" long screws
provided.
Secure cable duct to bowl
at location shown with (2)
B
#10 screws provided. One
per WashBar. Run loose
wire and cables through
the cable duct (2 places).
Cable Duct
(255-058)
Remove 3/8" compression nut/sleeve from the
hot and cold supply stop valves. Connect 3/8"
E
end of flexible supply hose to 3/8" compression
on supply stop valve. Ensure hot and cold supply
hoses are connected to hot and cold supply stop
valve. For TL option, only connect cold supply.
Attach 1/4" supply tube from
the LH WashBar to the 1/4"
supply valve outlet. Loosen the
compression nut on the valve
C
body. Push the 1/4" supply tube
firmly into the tube connector
until it is fully seated. Tighten
the compression nut by hand.
Repeat this step for RH WashBar
supply tube.
16
3/8"
Hot Supply/
Compression
Stop Valve
Nut
2/4/2019
D
Cold
Supply/
Stop
Valve
Cold Inlet
Hot Inlet
Bradley • 215-1843 Rev. E; ECN 18-08-023
For thermostatic mixing valve
installation, secure 1/2" supply hose
to hot water supply valve inlet. Secure
the other supply hose from cold water
supply to cold water supply valve inlet.
Secure valve to wall using (2) #10
fasteners (supplied by installer).
For tempered line installation, secure
1/2" supply hose to tempered water
supply and TL valve inlet (not shown).
Secure valve to wall using (2) #10
fasteners (supplied by installer).
Cable extension for LH
WashBar connects here.
Cable extension for RH
WashBar connects here.
Installation