LoRaWAN MODBUS MASTER - Guide utilisateur / User guide version V1.0.0
5.5. Starting up the product using a magnet
Once the product has been configured and its assembly has been finalised, the product is ready to be started up.
The start-up is carried out using a magnet which you place on the upper part of the product (cf. the diagram below). The magnet must be held
in position for at least 6 seconds so as to confirm the start-up of the product. When the magnet is well detected, the green LED lights up for 1
second.
Once the sigfox Pulse unit validates its start-up, it immediately transmits status frames followed by a data frame (according the defined periodi-
city).
NB : Once the sigfox Pulse unit has started up, it cannot be switched off.
Position of the magnet for
starting up the product
FR
EN
Page
71
of 80