4.1 Boiler Location Considerations

• Ambient room temperature always above 32°F (0°C) to
prevent freezing.
• Approved for installation in closets.
• Protect gas ignition system components from water
(dripping, spraying, rain, etc.) during operation and
service (circulator replacement, control replacement,
etc.).
• Wall mount only.
• Access to outdoors to meet minimum and maximum
pipe lengths for combustion air and vent piping. See
section 6.
• Drainage of water (or water - antifreeze solution) during
boiler service or from safety relief valve discharge. See
section 5.
• Access to system water piping, gas supply, and electrical
service. See sections 5, 7 and 8.
• Clearances to combustible materials and service
• Boiler must not be installed on carpeting.

4 - LOCATING BOILER

Figure 5 - Boiler Clearances
TABLE 1: BOILER CLEARANCES
Dimension
Left Side (B)
Bottom (F)
Vent piping
Required distances measured from boiler jacket.
(1)
Service, proper operation clearance recommendation.
(2)
9
A
B
Boiler
(Front View)
F
F L O O R
A
Boiler
D
(Side View)
Front
F
Materials
Top (A)
16" (41cm)
0" (0 cm)
0" (0 cm)
Front (D)
0" (0 cm)
Back (E)
0" (0 cm)
0" (0 cm)
0" (0 cm)
6" (15 cm)
C
F
Service
(1)(2)
(1)
16" (41cm)
1" (3 cm)
1" (3 cm)
1" 3 cm)
0" (0 cm)
12" (30 cm)
3/8" (1 cm)
6" (15 cm)
EN