Télécharger Imprimer la page

Munchkin Modern MK0094-011 Notice D'utilisation page 6

Publicité

Les langues disponibles

Les langues disponibles

How To Install
6a. For Drywall Without Stud / Plasterboard:
Drill a 7/32"(5.5mm) hole into the drywall at the
center mark. Insert a drywall anchor.
Peel the back off the sticky pad that is attached to
the wall cup. Then stick the wall cup onto the wall to
fi t your pencil marks.
Use a screwdriver or drill to insert the screw through
the center of wall cup into the drywall anchor.
Drywall
Anchor
6b. For Drywall with Stud:
Drill a 5/64"(2mm) pilot hole into the stud
(no anchor needed).
Peel the back off the sticky pad that is attached to
the wall cup. Then stick the wall cup onto the wall to
fi t your pencil marks.
Use a screwdriver or drill to insert the screw through
the center of the wall cup into the stud.
10
STEP 5: MOUNT YOUR GATE
1. Place the gate where you want to install it, then extend all 4 adjustment rods until they
6a. Drywall
7/32"
5.5mm
6a. Plasterboard
7/32"
5.5mm
6b. Stud
5/64"
2.0mm
reach the walls. Ensure that the ends of the adjustment rods are seated
inside the cups.
How To Install
11

Publicité

loading