4
After all wiring is routed to ceiling box, attach remaining cables to frame. Prior to pushing ceiling box into frame,
apply blue painter's tape (or equivalent) to the frame's painted border to help prevent scratching the paint upon
ceiling box installation. Line up the box and be certain that all four pins are in the unlocked position. Push ceiling box
up into frame. When ceiling box reaches the stops on the inside of the frame, push all four pins to the locked position.
The ceiling box is now secured to the frame.
IMPORTANT! - INSTALL PIN LABEL, APPROXIMATELY WHERE SHOWN, ON BOTH SIDES. Refer to ceiling box
installation instructions to complete installation. Remove protective tape after completion of installation.
5
(UNLOCKED
POSITION)
FIGURE
E
HRCB12 & HRCB22 HARD CEILING FRAME KIT 1' X 2' & 2' X 2'
INSTALLATION INSTRUCTIONS
CAUTION: RISK OF ELECTRICAL SHOCK. Disconnect power before installing or servicing.
NOTICE: For installation by a qualified electrician in accordance with all national and local electrical codes,
communications standards, the following instructions, and any instructions included with individual devices.
NOTICE: Ensure data/communications circuits are separated from lighting/power circuits in accordance with the NEC
and CE Code requirements.
CEILING BOX COMPATIBILITY/SIZING
Hard Ceiling Frame Kit
Rough Opening Size
HRCB12HCFK
13" X 25" +/- 1/16"
25" X 25" +/- 1/16"
HRCB22HCFK
1.
Installation of the HRCB-SR12 frame (shown below) requires a rough-in hole in the ceiling of 13" x 25", +/- 1/16".
Installation of the HRCB-SR22 frame requires a rough-in hole in the ceiling of 25" x 25", +/- 1/16".
The rough-in structure needs to be a minimum of 1-1/2" tall and may be made of metal or wood.
FRAME CORNER DETAIL COMMON TO BOTH HRCB-SR12 and HRCB-SR22.
There are 3 methods by which the frame kit can be retained in the ceiling:
Steel threaded rods: one per corner of the frame, 1/4-20 thread minimum to 3/8-16 thread maximum, centered
on a 11-1/2" x 23-1/2" rectangle, and extending down to within 2" to 6" of the ceiling's in-room surface.
Steel hanger cable: 3/32"- Diameter minimum and threaded thru the frame's appropriate slots/holes in the
corners of the unit.
Screws: install thru the appropriate holes in the corners of the frame, into the ceilings rough-in opening
structure. Two screws, minimum, per corner.
AVAILABLE KITS (SOLD SEPERATELY):
HRCBMNT1 - CABLE INSTALLATION KIT
HRCBTHRD - THREADED ROD INSTALLATION KIT
Wiring Device - Kellems
Hubbell Incorporated (Delaware)
40 Waterview Dr.
Shelton, CT 06484
1-800-288-6000
www.hubbell-wiring.com
PD3035
04/23
Ceiling Box Size Ceiling Box
Ceiling Box with Projector Mount
1' X 2'
HRCB12WHT
HRCB12PWHT
2' X 2'
HRCB22WHT
HRCB22PWHT
SLOTTED OPENING
FOR THREADED
ROD OR CABLE
HOLES FOR SCREWS
FIGURE
A
ENGLISH
HOLE FOR CABLE