INSTALLING OPTIONAL FAN KIT: Refer to step 7 for removal of door and step 2 for removal of adjustment bar cover.
Following the removal of door and adjustment bar cover, remove 4 screws (23) as shown and uninstall pole
adjustment bar (22).
CAUTION: ONCE THE LAST SCREW IS REMOVED FROM THE POLE ADJUSTMENT BAR (22), IT CAN FALL OUT. HOLD
POLE ADJUSTMENT BAR (22) IN PLACE WHILE REMOVING SCREWS.
Install fan kit per instructions. Reinstall pole adjustment bar (22). Torque all four flat head #8-32 X 3/8" long screws to
15 inch-lbs. Refer to step 2 to reinstall pole mount flange cover (3) and adjustment bar cover (2).
10.
HRCB22P PROJECTOR MOUNT PIPE INSTALLATION: Install 1-1/2" NPT projector mount pipe (supplied by customer)
into flange by turning clockwise until threaded connection is fully seated. Open access panel and secure pipe with set
screw (24) shown in FIGURE J (door and flange cover not shown for clarity). Finish installation per manufacturer's
projector mount instructions.
NOTE: MAXIMUM PROJECTOR LOAD INCLUDING MOUNTING ACCESSORIES - 50 LBS.
CENTER OF MASS OF SUSPENDED EQUIPMENT MUST BE WITHIN A 2.5" RADIUS OF THE CENTER LINE OF THE
FLANGE MOUNT.
DOOR AND COVERS NOT SHOWN FOR CLARITY
22
23
FIGURE
H
ACCESS SET SCREW
THROUGH HERE
FIGURE
J
HRCB22 & HRCB22P RECESSED CEILING BOX, 2' X 2' INSTALLATION
CAUTION: RISK OF ELECTRICAL SHOCK. Disconnect power before installing or servicing.
NOTICE: For installation by a qualified electrician in accordance with all national and local electrical codes,
communications standards, the following instructions, and any instructions included with individual devices.
NOTICE: Ensure data/communications circuits are separated from lighting/power circuits in accordance with the NEC
and CE Code requirements.
NOTICE: MAXIMUM GROSS WEIGHT HRCB22- 70 LBS; HRCB22P - 120 LBS.
IF INSTALLING HRCB22P (PROJECTOR MOUNT) SEE STEPS 1 - 4 BELOW AND REFER TO FIGURE A & B
IF INSTALLING HRCB22, PROCEED TO STEP 5.
FOR HARD CEILING INSTALLATION, FIRST INSTALL HRCB22HCFK HARD CEILING FRAME KIT.
Prior to ceiling installation, determine desired
1.
projector mount position. Projector mounting flange
(5) is assembled in the center location from the
factory. If default factory location will be used,
proceed to step 5. If changing to alternate location,
follow steps 2 thru 4.
NOTE: Projector mounting flange (5) position can be
changed after ceiling box installation, but may be
easier to complete while assembly is set upside down
on a work surface as shown in FIGURE A & B.
2.
Uninstall adjustment bar cover (2) by removing two
8-32 X 1/4" long cover screws (1) located in interior of
ceiling box. Pole mount flange cover (3) is not fastened
and will slip out once the adjustment bar cover (2) is
removed.
3.
Reposition projector mounting flange (5) by loosening
four #10-32 X 3/4" long hex screw (4) and slide to
alternate location. Torque all screws to 15 in-lbs.
24
4.
If installing optional fan kit, skip to step 9 prior to
reinstalling pole mount flange cover (3) and
adjustment bar cover (2). Refer to step 7 for ceiling
tile installation.
Wiring Device - Kellems
Hubbell Incorporated (Delaware)
40 Waterview Dr.
Shelton, CT 06484
1-800-288-6000
www.hubbell-wiring.com
PD3032
04/23
INSTRUCTIONS
3
5
FIGURE
A
FIGURE
B
ENGLISH
1
2
4
4
5

Publicité

loading

Sommaire des Matières pour Hubbell HRCB22

  • Page 1 NOTICE: Ensure data/communications circuits are separated from lighting/power circuits in accordance with the NEC and CE Code requirements. NOTICE: MAXIMUM GROSS WEIGHT HRCB22- 70 LBS; HRCB22P - 120 LBS. IF INSTALLING HRCB22P (PROJECTOR MOUNT) SEE STEPS 1 - 4 BELOW AND REFER TO FIGURE A & B IF INSTALLING HRCB22, PROCEED TO STEP 5.
  • Page 2 CEILING PANEL INSTALL: Open door by loosening two screws (11). Allow door to carefully swing down as shown in Install HRCB22 / HRCB22P (8) to a structural ceiling able to support five time the noted gross weight. Use FIGURE D.
  • Page 3 NECMD et du Code canadien de l' lectricit . AVIS - POIDS BRUT MAXIMUM HRCB22- 31,8 kg (70 lb); HRCB22P - 54,4 kg (120 lb). POUR LE MONTAGE D'UNE HRCB22P (POUR PROJECTEUR), CONSULTER LES TAPES 1 4 CI-DESSOUS ET SE R F RER AUX FIGURES A ET B.
  • Page 4 HRCB22 - Monter le panneau de plafond suspendu de 49,2 cm x 57,8 cm (19-3/8 po X 22-3/4 po) (12) (FOURNI PAR LE l' quipement interne.
  • Page 5 FIGURE Wiring Device - Kellems HUBBELL DE M XICO garantiza este producto, de estar libre de defectos en materiales y mano de obra por un a o a partir de su compra. Hubbell reparar o reemplazar el Hubbell Incorporated (Delaware) art culo a su juicio en un plazo de 60 d as.
  • Page 6 INSTALACI N DEL PANEL DE TECHO: Abra la puerta aflojando los dos tornillos (11). Permita que la puerta oscile Instale HRCB22 / HRCB22P (8) en un techo estructural capaz de soportar cinco veces el peso bruto indicado. Utilice cuidadosamente hacia abajo como se muestra en la FIGURA D.