(2pcs) align Loc C and secure the bracket into wood floor.
Move the unit to the align to the bracket Loc A, used B: Hexagon bolt (1pc) and C: Hexagon nut (1pc) to
fix.
3.CONCRETE FLOOR installation: (FigⅡ④)
After confirm the installed location, choose any hold of Loc D to secure the bracket into the concrete
floor
Using a concrete bit, drill Φ8mm pilot hold 45~55mm deep. Use E: Expansion screw (1 pc) enter
into the concrete, take out the nut, spring washer and washer. Align Loc D to E:Expansion screw(1 pc)
and put back the nut, spring washer and washer to fix on the concrete floor.
Move the unit to the align to the bracket Loc A, used B: Hexagon bolt (1pc) and C: Hexagon nut (1pc) to
fix.
ATTENTION:
Check the bracket: After installing the bracket, please try to using appropriate intensity to tipping the unit. If
the unit not tipping that means the bracket mounted securely, or MUST be reinstalled following these
instruction.
OPERATING YOUR WINE COOLER/BEVERAGE COOLER
AND SETTING THE TEMPERATURE CONTROL
Control System Instruction
① "
" Button
•
3 sec
To control this appliance turn on/off
3 seconds).
② "
" Button
•
To control the inner light turn on/off.
③ "
" Button
•
To set the temperature of the upper chamber
④ "
" Button
•
To set the temperature of the lower chamber.
⑤ LED display window
•
To set the temperature of the upper chamber.
⑥ LED display window
•
To set the temperature of the lower chamber.
⑦ indicator light
•
Compressor in operation display.
1
3 sec
5
2
( press and hold this buttons for approximately
.
7
3
4
6
7
EN