Télécharger Imprimer la page

Kessel SECOH SLL Serie Instructions D'installation Et De Service page 30

Publicité

Les langues disponibles

Les langues disponibles

All manuals and user guides at all-guides.com
2.3.2. Instructions To Electric Installation
A breaker with ground-fault-protection should be set in the
wiring of power supply. No provisions o breaker with ground-
fault-protection will be cause of electric shock.
When installing the air pump outdoors, be sure to use
a waterproof receptacle for the electric installations.
Exposing of the parts charged to rain water will be cause of
electric shock.
2.3.3. Instructions To Mounting
When installing the air pump in a casing, take care that it is well ventilated,
proofing to keep temperature inside the box below 40°C.
The exclusive mount for air pump installation made of concrete should be
arranged. The mount should be away from the foundation and its height
should be min. 10 cm higher than the foundation. Noise may be caused by
vibration of the air pump mounted on an unstable place such as concrete blocks,
shelf etc.
Install the air pump on a horizontal mount taken a level after the concrete
has completely set. Setting the air pump before concrete has been completely
dry can embed it herein. The load caused by setting the air pump in a position out
of level will be partially applied on rubber parts, which may shorten the life of the
parts.
In case of mounting the air pump at a place got wet
heavily, provide a roof to keep the air pump from the
slanting rain. Water of slanting rain etc. taken in the air
pump will enter the part charged, which can be cause of
leakage, electric shock or short circuit.
2. Instructions
CAUTION
CAUTION
CAUTION
30

Publicité

loading