4. Installing the refrigerant piping
A
B
D
C
A Stop valve <Liquid side>
B Stop valve <Gas side>
C Service port
D Open/Close section
Fig. 4-4
B
A
I
F
Fig. 4-5
4.6. Addition of refrigerant
• Additional charging is not necessary if the pipe length does not exceed 20 m, 70 ft
for A12-A30, 30 m 100 ft for A36, A42.
• If the pipe length exceeds the specifi ed length above, charge the unit with additional
R410A refrigerant according to the permitted pipe lengths in the chart below.
Notes:
1. When the unit is stopped, charge the unit with the additional refrigerant through
the liquid stop valve after the pipe extensions and indoor unit have been vacu-
umized.
When the unit is operating, add refrigerant to the gas check valve using a
safety charger. Do not add liquid refrigerant directly to the check valve.
Max pipe
Max height
Model
length
difference
PUZ-A12, 18 30 m, 100 ft 30 m, 100 ft
PUZ-A24, 30 50 m, 165 ft 30 m, 100 ft
PUZ-A36, 42 50 m, 165 ft 30 m, 100 ft
PUY-A12, 18 50 m, 165 ft 30 m, 100 ft
PUY-A24, 30 69 m, 225 ft 30 m, 100 ft
PUY-A36, 42 69 m, 225 ft 30 m, 100 ft
6
B
A
C
H
D
E
F
I
G
E Local pipe
F Sealed, same way for gas side
G Pipe cover
H Do not use a wrench here.
Refrigerant leakage may result.
I Use 2 wrenches here.
G
D
H
J
E
Notes:
1. The fi gure to the left is an example only.
The stop valve shape, service port po-
sition, etc., may vary according to the
model.
2. Turn section A only.
(Do not further tighten sections A and B
together.)
C Charge hose
D Service port
Fig. 4-6
20 m
24 m
27 m
30 m
34 m
70 ft
80 ft
90 ft
100 ft
110 ft
0.06 kg
0.11 kg
0.17 kg
0
-
2 oz
4 oz
6 oz
0.20 kg
0.40 kg
0.60 kg
0.79 kg
0
7 oz
14 oz
21 oz
28 oz
0.20 kg
0
0
0
0
7 oz
0.03 kg
0.06 kg
0.09 kg
0.11 kg
0
1 oz
2 oz
3 oz
4 oz
0.09 kg
0.17 kg
0.26 kg
0.34 kg
0
3 oz
6 oz
9 oz
12 oz
0.09 kg
0
0
0
0
3 oz
4.4. Refrigerant pipe airtight testing method
(1) Connect the testing tools.
• Make sure the stop valves A B are closed and do not open them.
• Add pressure to the refrigerant lines through the service port C of the liquid stop valve D.
(2) Do not add pressure to the specifi ed pressure all at once; add pressure little by little.
1 Pressurize to 0.5 MPa (5 kgf/cm
not decrease.
2 Pressurize to 1.5 MPa (15 kgf/cm
not decrease.
3 Pressurize to 4.15 MPa (41.5 kgf/cm
refrigerant pressure.
(3) If the specifi ed pressure holds for about one day and does not decrease, the pipes have
passed the test and there are no leaks.
• If the surrounding temperature changes by 1 °C, the pressure will change by about 0.03
MPa (0.3 kgf/cm
2
G). Make the necessary corrections.
(4) If the pressure decreases in steps (2) or (3), there is a gas leak. Look for the source of
the gas leak.
4.5. Stop valve opening method (Fig. 4-5)
1 Remove the cap and turn the valve rod counterclockwise as far as it will go with the
use of a 4 mm, 5/32 inch hexagonal wrench. Stop turning when it hits the stopper.
(ø6.35, 1/4 inch: Approximately 4.5 revolutions) (ø9.52, 3/8 inch: Approximately
10 revolutions)
2 Make sure that the stop valve is open completely, push in the handle and rotate
he cap back to its original position.
A Valve
B Unit side
C Operation section
D Cap
E Local pipe side
F Pipe cover
G Service port
H Wrench hole
Refrigerant pipes are protectively wrapped for A24-A42
• The pipes can be protectively wrapped up to a diameter of ø90 mm, 3-35/64 inch
before or after connecting the pipes. Cut out the knockout in the pipe cover follow-
ing the groove and wrap the pipes.
Pipe inlet gap for A24-A42
• Use putty or sealant to seal the pipe inlet around the pipes so that no gaps remain.
(If the gaps are not closed, noise may be emitted or water and dust will enter the
unit and breakdown may result.)
Precautions when using the charge valve (Fig.4-6)
Do not tighten the service port too much when installing it, otherwise, the valve core
could be deformed and become loose, causing a gas leak.
After positioning section B in the desired direction, turn section A only and tighten it.
Do not further tighten sections A and B together after tightening section A.
2. After charging the unit with refrigerant, note the added refrigerant amount on
the service label (attached to the unit).
Refer to the "1.5. Using R410A refrigerant air conditioners" for more informa-
tion.
• Be careful when installing multiple units. Connecting to an incorrect indoor unit
can lead to abnormally high pressure and have a serious effect on operation per-
formance.
Additional refrigerant charging amount (kg/oz)
37 m
40 m
43 m
46 m
49 m
120 ft
130 ft
140 ft
150 ft
160 ft
-
-
-
-
-
0.99 kg
1.19 kg
1.39 kg
1.59 kg
1.79 kg
35 oz
42 oz
49 oz
56 oz
63 oz
0.40 kg
0.26 kg
0.79 kg
0.99 kg
1.19 kg
14 oz
21 oz
28 oz
35 oz
42 oz
0.14 kg
0.17 kg
0.20 kg
0.23 kg
0.26 kg
5 oz
6 oz
7 oz
8 oz
9 oz
0.43 kg
0.51 kg
0.60 kg
0.68 kg
0.77 kg
15 oz
18 oz
21 oz
24 oz
27 oz
0.17 kg
0.26 kg
0.34 kg
0.43 kg
0.51 kg
6 oz
9 oz
12 oz
15 oz
18 oz
G), wait 5 minutes, and make sure the pressure does
2
G), wait 5 minutes, and make sure the pressure does
2
2
G) and measure the surrounding temperature and
I Double spanner section
(Do not apply a spanner other than to this sec-
tion.Doing so would cause refrigerant leaks.)
J Seal section
(Seal the end of the heat insulation material at
the pipe connection section with whatever seal
material you have on hand so that water does
not infi ltrate the heat insulation material.)
K Handle
50 m
52 m
55 m
58 m
61 m
165 ft
170 ft
180 ft
190 ft
200 ft
-
-
-
-
-
1.89 kg
-
-
-
-
67 oz
1.29 kg
-
-
-
-
46 oz
0.27 kg
-
-
-
-
10 oz
0.81 kg
0.85 kg
0.94 kg
1.02 kg
1.11 kg
29 oz
30 oz
33 oz
36 oz
39 oz
0.55 kg
0.60 kg
0.68 kg
0.77 kg
0.85 kg
20 oz
21 oz
24 oz
27 oz
30 oz
64 m
67 m
69 m
210 ft
220 ft
225 ft
-
-
-
-
-
-
-
-
-
-
-
-
1.19 kg
1.28 kg
1.32 kg
42 oz
45 oz
47 oz
0.94 kg
1.02 kg
1.06 kg
33 oz
36 oz
38 oz