INSTALLATION PROCEDURE
Tub Filler Base
1. Remove the plaster guard of
the tub filler base using a Phillips
screwdriver. Since the plaster guard
and the screws will be used later,
put them in a safe location where
they would not be lost. Secure the
13mm
tub filler base so
that it is level.
Level
(a) The spout outlet direction is
3/8"(10)
opposite to the red indication on
the base. After the bath tub set up
position is confirmed, secure base
after the approximate setup direc-
tion is determined.
Spout Outlet
In fixing the spout body, the spout
outlet direction can also be ad-
justed.
Plumbing
2. When connecting pipes use
sealant, confirm the cold/hot marks
on the tub filler base so that
H
C
the cold supply line and the hot
supply line are not inversely con-
nected, and connect the piping
to the tub filler base.
Cleaning the supply lines.
3. Before installing the spout
4