Establish cable pass-through
Conduit pipe connection (variant A)
The conduit pipe is to be installed with max. 45° bend.
Select drill with appropriate hole saw (Art. no. 500101).
Carry out drilling for the conduit pipe in accordance with
the hole saw instructions.
Insert conduit pipe seal.
Grease conduit pipe and slide through the conduit pipe
seal.
Cables/plugs can be fed through the conduit pipe.
... or
Cable fastener (variant B)
For this connection the mains cable must be cut in
order to pull it through the cable screw connection.
When installed correctly and in accordance to the reg-
ulations for electrical safety the manufacturer's war-
ranty remains unaffected.
Drill hole for cable fastener (M16).
Insert cable fastener into the chamber, screw into place
and bond with PVC adhesive.
Feed cable through the cable fastener and clamp in
place.
4.4
Fit and install pump
Grease seal.
Mount fittings to pump and fasten in
place with screws.
Hang pump in place.
Connect pump to pressure pipe con-
nection.
Lock the one-handed closure in posi-
tion.
Feed cable through the conduit pipe
and connect electrically.
Ensure that there is adequate cable
length to be able to remove the
pump during maintenance.
016-233_02
27 / 116