Installation Instructions; Automatic Operation; Manual Operation - Zoeller 10-0229 Mode D'emploi

Interrupteurs à double flotteurs superposés à niveau variable
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

FIGURE 5
B
A

INSTALLATION INSTRUCTIONS

1. Determine the desired pumping range for your installation (see Figure 5 and Figure 10). (B) is the distance between the mounting point of
attachment and the float. The distance (B) determines (A) the desired pumping range.
2. At distance (B), determined from Figure 10, place the cord into the clamp as shown in Figure 6.
3. Position the float to the desired "OFF" level and secure the clamp to the discharge pipe as shown in Figure 6. See Figure 5 noting water
line. NOTE: Do not install cord under hose clamp
4. Tighten hose clamp using a screwdriver. NOTE: Do not overtighten. Overtightening may result in damage to the plastic clamp. Make sure
the float cable cannot touch the excess hose clamp band during operation.
NOTICE: Do not adjust "Off'' level below discharge on pump.
5. Insert the piggyback plug from the switch into a standard grounded outlet of proper voltage. For automatic operation, plug the pump directly
into the piggyback plug (see Figure 7). Pump can be manually operated by bypassing the piggyback plug.
NOTICE: For installation utilizing watertight junction box or similar connections, see Figure 8.
NOTICE: For installation as a control switch for magnetic starter, see Figure 9.
INSTALLATION INSTRUCTIONS CONTINUED ON NEXT PAGE
CORDS SECURED TO
DISCHARGE PIPE
"ON"
LEVEL
"OFF"
LEVEL
SK305B
.
PUMP PLUG
SWITCH PLUG
© Copyright 2020 Zoeller
FIGURE 7
AUTOMATIC
OPERATION
Co. All rights reserved.
®
3
FIGURE 6
3-1/2" (89 MM)
TETHER LENGTH
FOR DOUBLE
FLOAT
3-1/2" (89 MM)
MINIMUM
TETHER LENGTH
FOR PUMP
SWITCH
SK1301H
MANUAL
OPERATION
SK308A

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

10-120910-196410-196610-023010-121010-1965 ... Afficher tout

Table des Matières