Gurari GCH I 237 Manuel D'installation page 6

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1. examination
Before starting the actual installation, the device should be checked. In addition to the control of
externally recognizable damage, a function check has to be done. Take out the device from the packing,
get rid of all packing materials and put the device with the back on the floor / table. After connecting to
a power supply, the lighting as well as the function of each stage should be checked. Please take care
that exhaust outlet is open through check.
2. Installation of the hood
1.
Using the added installation positioning sticker, mark the required position for the device
mounting on the floor/ceiling and paint the necessary holes. Fixtures sent with the set are provided for
attachment in massive concrete or stone flooring. If your floor structure is different, the substitution of
attachment bolts is required. In such a way, take care of buying appropriate fasteners.
2.
Drill 2 holes in the ceiling for fastening the ceiling bracket.
3.
Screw the ceiling bracket to the ceiling.
4.
On the next stage, take the electro cable, and push them through the relevant holes of the floor
cover and extension tube.
5.
Put the cover on the ceiling bracket and fasten it to the ceiling bracket
6.
Screw the extension tube into the ceiling bracket
7.
Attach the hood to the extension tube
8.
Adjust the height of the hood with the tube and secure it with the fixing screw.
9.
At the end, connect to the power supply inserting the plug connector into the socket provided for
it. If the outlet and power supply output is positioned below the protective plate, then between steps 4
and 5 drill an additional hole through the protective plate, through which you will push the cable for the
power supply connection. For this, in case of necessity remove the plug connector to repeatedly mount
it in the upper position over the protective plate/cover or connect directly to the power supply. For this
engage a professional electrician, who will care about the correct conduction of such an operation and
ensuring a safe connection to the power supply. Connection to the power supply should be conducted
with the de-energized equipment. The power supply should not be turned on before the conduction of
proper isolation.
4
5
6

Publicité

Table des Matières
loading

Table des Matières