Ancona TORNADO ISLAND III 36 Mode D'emploi page 12

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Step 5: Finishing installation
• Slide the inner chimney up to the ceiling and attach it to the ceiling bracket using the screws. (See Fig. #7)
• Remove the protective coating from the hood body and outer chimney.
• Installation is finished.
Step 6: Installing filters
• To install the filters, follow these four steps (See Fig. #8):
• Angle the filtters toward the back of the hood.
• Push the button on the handle of the filter
• Release the handle when the handle fits into a resting position
• Repeat to install all filters
INSTALLATION CONTINUE:
12
Fig # 7
Fig # 8

Publicité

Table des Matières
loading

Table des Matières