Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Wiring Diagram

Globe/Refractor Replacement
VPGL-LED, VPGL-DIFF, VPGL-GLASS, LPG-R5
Globe/refractor replacement:
1. If desired, globe/refractor may be replaced with parts listed above.
2. De-energize the fixture before removing the globe/refractor.
3. Remove installed globe/refractor by unthreading it counter clockwise.
4. Ensure that the gasket seal surface is clean and free from dirt or foreign particles.
5. Ensure that the globe/refractor is clean and free from dirt or foreign particles.
6. Align the threads of the globe/refractor with that of the globe collar. Rotate the globe/refractor into the globe collar clockwise
making certain to compress the gasket seal.
Except as expressly provided by Appleton Grp, LLC (Appleton), Appleton products are intended for ultimate purchase by industrial users and for operation by persons trained and experienced in the use and maintenance of this equipment
and not for consumers or consumer use. Appleton warranties DO NOT extend to, and no reseller is authorized to extend Appleton's warranties to any consumer.
While every precaution has been taken to ensure accuracy and completeness in this manual, Appleton Grp, LLC. assumes no responsibility, and disclaims all liability for damages resulting from use of this information or for any errors or
omissions. Specifications are subject to change without notice. The Appleton and Emerson logos are registered in the U.S. Patent and Trademark Office. All other product or service names are the property of their registered owners.
©2019 Appleton Grp, LLC. All rights reserved.
FIGURE 3: LUMINAIRE WIRING SYSTEM
TABLE 1: LUMINAIRE WIRING SYSTEM
FIGURE 4: GLOBE/REFRACTOR SEALING DETAIL
650583-000 Rev. C 02/25/19 • Page 4 of 8

Publicité

Table des Matières
loading

Table des Matières