8. PREPARE HOOD
6. Measure the required length of 8" round metal duct from the adapter/damper
to the ductwork rough-in in the ceiling. Connect this section of duct to the
adapter/damper and seal joint with metal foil duct tape.
9. INSTALL HOOD
BE CAREFUL when installing the decorative flue and hood, they may have sharp edges.
DO NOT REMOVE the protective plastic film covering the decorative flue (upper and lower) and the hood yet.
1. Attach blower box assembly to lower angle brackets using 16 no. 10-32 x 1/2"
quadrex screws (4 per angle brackets). Connect hood duct to ceiling duct and
seal joint with metal foil duct tape.
NOTE: Ensure electrical channel is facing where the front of the hood will be
positioned.
2. Run house wiring through wire clamp into blower box electrical channel. Tighten
wire clamp to secure house wiring cable to blower box.
NOTE: The length between the top of the blower box and the bottom of the hood
is 12 3⁄16".
(ALL MODELS) (
CONT
WARNING
!
CAUTION
'
)
D
HD0424
1
HD0565
9
HJ0067
F
RONT
H
2
S
EAM
OUSE WIRING